Wardieh Lot 83 - Fellow Constructor

Search
Go to content

Main menu:

Wardieh Lot 83

Structure > Buildings > Residential

          
Location                      
  Hamra -  Beirut – Lebanon
Client                             Engineer Iskandar Karam
Design Date                    June 2011
Project Area                    6550 m2
Construction Material       Reinforced Concrete
Completion time              26 days

Nature of Misssion            Architectural    X Structural      Mechanical    Electrical

Type of Mission              X New Design                        Shop Drawings
                                       Conceptual                         Value Engineering
                                       Retrofitting                         Assessment Report

 
Back to content | Back to main menu