Bridge Girders PT detailing - Fellow Constructor

Search
Go to content

Main menu:

Bridge Girders PT detailing

Structure > Infrastructure > Land Transport

          
Location                      
  Saudi Arabia
Client                             DSI - Dywidag Systems
Design Date                    December 2014
Project Area                    Var. length
Construction Material       Prestressed Concrete Girders
Completion time              10 days / Element

Nature of Misssion            Architectural    X Structural      Mechanical    Electrical

Type of Mission                 New Design                    X  Shop Drawings
                                       Conceptual                         Value Engineering
                                       
Retrofitting                        Assessment Report

 
Back to content | Back to main menu