DEPKAR Pedestrian Bridge - Fellow Constructor

Search
Go to content

Main menu:

DEPKAR Pedestrian Bridge

Structure > Infrastructure > Land Transport

          
Location                      
  Riyadh – Saudi Arabia
Client                             Almabani General Contractors – Eng. Elie Chrabieh
Design Date                    September 2013
Project Area                    32 lm
Construction Material       Reinforced Concrete
Completion time              8 days

Nature of Misssion            Architectural    X Structural      Mechanical    Electrical

Type of Mission              X New Design                     X  Shop Drawings
                                       Conceptual                          
Value Engineering
                                       Retrofitting                         Assessment Report

 
Back to content | Back to main menu