Main menu:
Aoun Building conversion:
A building of 40 years old stands unfinished. It was designed based on a social and environmental context that changed through time. F.C Architects restudied the environment, the views, the sun movement, the spatial needs of the current occupants, and reshaped the building based on these new considerations.
One of the main changes in the program is to integrate a work-
A new vertical circulation was conceived to split the main elevation between the residential part and the work-
Location Fanar -
Design Date 2012
Nature of Misssion X Architectural Structural Mechanical Electrical
Type of Mission X New Design Shop Drawings
Conceptual Value Engineering
Permit Execution Drawings
Preliminary Design Assessment Report