Integral Bridges Development of Eastern Part of King Abdullah Road

Structure > Infrastructure > Land Transport

          
Location                      
  Riyadh – Saudi Arabia
Client                             Almabani General Contractors – Eng. Elie Chrabieh
Design Date                    May 2011
Project Area                    9350 m2
Construction Material       Reinforced Concrete
Completion time              26 days

Nature of Misssion            Architectural    X Structural      Mechanical    Electrical

Type of Mission              X New Design                     X  Shop Drawings
                                       Conceptual                      
X  Value Engineering
                                       Retrofitting                         Assessment Report

 