Shoring for curved bridge

Structure > Infrastructure > Land Transport

          
Location                      
  Riyadh – Saudi Arabia
Client                             Almabani General Contractors – Engineer Elie Chrabieh
Design Date                    May 2012
Project Area                    315 m2
Construction Material       Reinforced Concrete footings & Steel structure
Completion time              26 days

Nature of Misssion            Architectural    X Structural      Mechanical    Electrical

Type of Mission                 New Design                    X  Shop Drawings
                                       Conceptual                         Value Engineering
                                       
Retrofitting                     X  Assessment Report

 